NOVOSHAKHITNSK REFINERY
Novoshakhtinsk, Rostov Region
Novoshakhtinsk Oil Refinery
Chemical Technology, LLC is involved in the implementation of the projects «Novoshakhtinsk Refinery 3rd Construction Phase. Integrated Delivery of Foreign and Domestic Equipment» at the Novoshakhtinsk Refinery:CONDENSATE STABILIZER UNIT FOR ACHIMOV DEPOSITS IN NADYM-PUR-TAZOVSKIY REGION
Novy Urengoy, Yamalo-Nenets Autonomous Okrug
Work scope:
Project in figures:
Total construction area 55 522 m2Poured:
Concrete 19 550 m3Installed:
Metalwork 19 865 tonsMobilized (maximum values):
Personnel 1 162 pers.DE-ETHANIZATION GAS TREATMENT UNIT /
BOOSTER COMPRESSION STATION
Novy Urengoy, Yamalo-Nenets Autonomous Okrug
Condensate Transportation Preparation Plant
Work scope:
Project in figures:
Total construction area 117 754 m2Poured:
Concrete 9 600 m3Installed:
Metalwork 9 232 tonsMobilized (maximum values):
Personnel 887 pers.NATURAL GAS TREATMENT PLANT
Markovsky Oil and Gas Condensate Field
Irkutsk Region
Work scope:
Project in figures:
Butt welds 14 500 inch/diam.Mobilized (maximum values):
Personnel 98 pers.COMPLEX GAS TREATMENT UNIT
Yaraktinskoye Oil and Gas Condensate Field,
Irkutsk Region
Work scope:
Project in figures:
Butt welds 55 500 inch/diam.Mobilized (maximum values):
Personnel 230 pers.OLEFIN PRODUCTION COMPLEX
Nizhnekamsk, Republic of Tatarstan
Nizhnekamskneftekhim Plant
Work scope:
Project in figures:
Butt welds 75 305 inch/diam.Mobilized (maximum values):
Personnel 121 pers.COMPLEX FOR RECEIPT, STORAGE AND SHIPPING
OF LIQUEFIED PETROLEUM GASES
Ust-Kut, Irkutsk Region
Work scope:
Project in figures:
Butt welds 3 176 pcs.Mobilized (maximum values):
Personnel 40 pers.«REVAMP OF THE ETHYLENE OXIDE AND GLYCOL PRODUCTION» PROJECT OF SIBUR-NEFTEKHIM JSC